Working in the Trenches

With the new water supply lines and sewer pipes installed in the remodeled lower level, it was time to fill the access trenches. Rebar was pounded into the surrounding slab to provide stability between the old and new sections. Concrete was carried into the building in wheelbarrows, then dumped into place. After spreading it with a shovel, the concrete was finished by hand to create a smooth, level surface.