ECLC's electrical infrastructure needed to be updated in the older sections of the church, as well as expanded to handle the requirements of the new additions. Main distribution panels to serve the entire site were installed under the kitchen, and connected to subpanels throughout the building. Next, heavy cables from the main panels were pulled through underground conduits and hooked up to a large transformer located by the east parking lot. Yesterday, Xcel Energy completed the final step by linking our new system to the power grid.